ShareDunia

Capsule sized Insights on Indian Share market & Business

Brahmaputra Infrastructure receives orders from the office of Chief Engineer Project Udayak

Brahmaputra Infrastructure Limited has bagged order Worth INR 15.39 crores from the office of Chief

Brahmaputra Infrastructure Limited has bagged order Worth INR 15.39 crores from the office of Chief Engineer Project Udayak — PIN- 931715 C/O 99 APO for execution of Construction of PMT Married Accommodation Phase- 1 for HQ Project Udayak at DoomDooma Including Planning, Design, Drawing and Construction of Internal Roads.

Loading